StatsOpsHypothesis TestingRCorrelation
Statistical Analysis of MBTA Transit Efficiency
problem · Evaluate service reliability gaps between transit lines to propose operational efficiency improvements.
what shipped
- Hypothesis testing (N = 80+) proved the Orange Line consistently outperformed the Green Line despite higher demand.
- Recommended real-time frequency modulation to mitigate bottlenecks, backed by crowd-vs-delay correlation.